White Pass and Yukon Route

The White Pass and Yukon Route (WP&YR) is a historic narrow-gauge railway linking Skagway, Alaska, with Whitehorse, Yukon. Constructed in the frantic years of the Klondike Gold Rush and completed in 1900, it served as the primary transportation artery to the Yukon interior for decades, supplanting the Chilkoot Trail. Following its closure as a commercial freight line in 1982, it was revived as a heritage railway in 1988 and is now a major tourist attraction, drawing visitors for its dramatic mountain scenery and living history. The railway was designated an International Historic Civil Engineering Landmark in 1994 and was purchased by Carnival Corporation & plc in July 2018.

Construction and the Gold Rush Era

Prospectors flooding north faced a gruelling trek from the ports of Skagway or Dyea, Alaska, over the treacherous Chilkoot or White Passes into Canada. Canadian authorities required each person to bring one ton of supplies, necessitating multiple trips and creating an urgent demand for reliable transportation. In 1897, the Canadian government received 32 proposals for Yukon railroads, but most were never realized. That same year, three separate companies were organized to build a rail link from Skagway to Fort Selkirk, Yukon, a distance of 325 miles. British investors, organized by the Close Brothers merchant bank, provided the primary financing for the ambitious project. Construction contractor Michael James Heney chose a 3 ft narrow gauge to reduce costs, as it required a narrower roadbed, especially where blasting through solid rock was necessary, and allowed for tighter curves to follow the mountainous terrain. Even with this advantage, construction required 450 tons of explosives to reach the White Pass summit.

Construction began in May 1898 but was immediately complicated by the lawless environment of Skagway, dominated by crime boss Soapy Smith. Samuel H. Graves, the railway company president, was elected chairman of a local vigilante committee aiming to expel Smith's gang of confidence men and rogues. The conflict culminated on July 8, 1898, in the Shootout on Juneau Wharf, where Smith was killed. Graves witnessed the event, and the railway helped block escape routes to aid in capturing the remaining gang members. Despite these obstacles, track-laying progressed swiftly. The first train in Alaska operated on July 21, 1898, hauling passengers four miles out of Skagway. On July 30, 1898, the charter rights of the three companies were acquired by the newly formed White Pass & Yukon Railway Company Limited, incorporated in London. By mid-February 1899, the rails had reached the 2,885-foot summit of White Pass, 20 miles from Skagway.

The railway pushed onward, reaching Bennett, British Columbia, on July 6, 1899. Construction also began north from Carcross toward Whitehorse that same summer. Crews working along the difficult lakeshore from Bennett connected to Carcross the next year. The last spike was driven on July 29, 1900, with regular service commencing on August 1, 1900. By the time of its completion, the peak of the gold rush had subsided, but the railway was firmly established as the critical transportation link to the Yukon interior. The ceremonial spike was made of iron, as a prepared gold spike proved too soft and was merely hammered out of shape instead of being driven.

Engines 3001 & 3005 Early morning May 26th, 2003
Photo: Helios180 / Wikimedia Commons (CC BY-SA 4.0)

Commercial Operations and Expansion

With the gold rush fading, the railway's focus shifted to serving professional mining operations for metals like copper, silver, and lead. The WP&YR, in conjunction with its fleet of riverboats, formed the only practical route from the Yukon interior to the sea at Skagway. While ore and concentrates became the bulk of freight, the line also carried passengers and general supplies, maintaining a monopoly on land access to Skagway for decades. The company had plans and financing to extend the line from Whitehorse to Carmacks, but instead used the capital to purchase most of the riverboats on the Yukon River, creating an integrated transportation system to Dawson City and avoiding a bottleneck in river service.

After the main line was completed in 1900, some minor expansion of the railway occurred. In 1901, the Taku Tram, a two and a half mile portage railroad, was built at Taku City, British Columbia. It operated until 1951, carrying passengers and freight between steamships on Tagish Lake and Atlin Lake. In 1910, the WP&YR operated a branch line to Pueblo, a mining area near Whitehorse, though this line was abandoned in 1918.

  • Pueblo Branch (1910): A short branch line to a mining area near Whitehorse. Abandoned in 1918.
  • Riverboat Fleet Acquisition: The White Pass used funds intended for rail expansion to purchase most of the riverboats operating between Whitehorse and Dawson City.
  • SS Tutshi and MV Tarahne: Steamships connected by the Taku Tram. The Tutshi was destroyed by fire around 1990, while the Tarahne was restored for special events.

By June 1914, the WP&YR had 11 locomotives, 15 passenger cars and 233 freight cars operating on 110 miles of trackage. It generated $68,368 in passenger revenue and $257,981 in freight revenue. The operation was profitable as operating expenses were only $100,347. While all other railroads in the Yukon, such as the Klondike Mines Railway at Dawson City, had been abandoned by 1914, the WP&YR continued to operate. During the Great Depression, traffic was sparse and for a time trains operated as infrequently as once a week.

The railway's equipment and operations evolved significantly over its commercial life. Key developments included the purchase of its last steam locomotives in May 1947, a pair of Baldwin-built 2-8-2 Mikado types numbered 72 and 73. The company was financially restructured in 1951 under a new holding company, White Pass and Yukon Corporation Ltd., which paid its first dividend of 10 cents per share in 1959. The railway began dieselization in the mid to late 1950s, one of the few North American narrow-gauge railroads to do so, acquiring locomotives from General Electric, American Locomotive Company (ALCO), and Montreal Locomotive Works. Steam locomotives 72 and 73 were retired from revenue service on June 30, 1964, and replaced by diesels. In 1956, the WP&YR pioneered intermodal container freight, advertising as the 'Container Route' and operating an early container ship, the Clifford J. Rogers, built in 1955, although its containers were smaller than modern standards.

The railway invested in seven new 1,200 hp ALCO locomotives, new freight cars, ore buckets, a straddle carrier at Whitehorse, a new ore dock at Skagway, and significant infrastructure improvements. This included a new tunnel and bridge built in the fall of 1969 to bypass the tall steel cantilever bridge at Dead Horse Gulch, which could not handle the heavier ore trains. This enormous investment made the company financially dependent on continued ore traffic. Passenger traffic also increased during this period as cruise ships began visiting Alaska's Inside Passage, though there was no road from Skagway to Whitehorse until 1978. The railway's locomotive colour scheme changed from green and yellow with a thunderbird emblem to a blue, black, and white pattern during this era, though the original scheme was restored in the early 1990s.

Video: Expert Guide to White Pass & Yukon Route Railroad in Skagway, Alaska (Alaska Shore Tours, YouTube)

World War II and the U.S. Army Lease

The strategic importance of Alaska during World War II dramatically transformed the White Pass and Yukon Route. Following the Attack on Pearl Harbor and Japanese occupation of some Aleutian Islands, the United States and Canada prioritized securing an overland supply route, leading to the construction of the Alaska Highway. Whitehorse became a key staging point, supplied almost exclusively by the WP&YR. Despite its worn-out pre-war condition, the railroad's traffic more than doubled in the first nine months of 1942, moving 67,496 short tons. Deeming this insufficient, the U.S. Government leased the railway effective at 12:01 a.m. on October 1, 1942, placing it under the control of the United States Army's Military Railway Service (MRS).

The 770th Railway Operating Battalion took over train operations alongside civilian staff. Major John E. Ausland, a former Chicago, Burlington and Quincy Railroad executive, was named superintendent, and Lieutenant Stanley Jerome Gaetz served as trainmaster. An accommodation was quickly reached with Canadian authorities to 'make an illegal action legal,' as foreign government operation within Canada was technically forbidden. The MRS scoured the United States for additional narrow-gauge equipment, bringing a diverse collection of locomotives and rolling stock to Skagway. This included seven Denver & Rio Grande Western K-28 class 2-8-2s acquired just prior to the lease, 2-8-0s from the Silverton Northern and Colorado & Southern, a pair of East Tennessee & Western North Carolina 4-6-0s, and eleven new War Department Class S118 2-8-2s. The army's contribution of 26 engines and 258 cars soon eclipsed the WP&YR's original roster of 10 locomotives and 83 cars.

Traffic volumes soared to unprecedented levels under military control. In the last three months of 1942, the railroad moved 25,756 short tons. The tonnage for the full year of 1943 reached 281,962 short tons, equivalent to ten years of typical prewar traffic. This immense effort was achieved despite some of the most severe winter weather recorded since 1910, with gales, snowdrifts and temperatures of -30°F (-34°C) blockading the line from February 5 to 15, 1943, and again from January 27 to February 14, 1944. The peak single-day movement occurred on August 4, 1943, when the railway moved 38 trains north and south, totaling 3,346 gross short tons over 2,236 locomotive-miles in 24 hours. Control of the railroad was handed back to its civilian operators late in 1944, leaving a legacy of vastly upgraded capacity and proven strategic value.

Skagway Historic District, Alaska, United States
Photo: Diego Delso / Wikimedia Commons (CC BY-SA 4.0)

Closure and Revival as a Heritage Railway

The railway's commercial fortunes became inextricably linked to the Faro mine. When metal prices collapsed in April 1982, the mine and others closed, stripping the WP&YR of its primary revenue. After operating at a significant loss for several months carrying only passengers, the railway ceased all commercial operations on October 7, 1982. Equipment was sold off, with five ALCO diesels sold to a railroad in Colombia and three newer MLW-built ALCOs sold to US Gypsum in Plaster City, California. Only one of these modern narrow-gauge diesels, the last built for a North American customer, was ever delivered to the White Pass. The railway was featured in the first episode of the BBC Television series 'Great Little Railways' in 1983.

The shutdown, however, was brief. A booming Alaska cruise industry, with ships docking directly adjacent to the railway's tracks in Skagway, created a new opportunity. Cruise operators recognized the line's historic appeal and scenic grandeur as a major tourist draw. Following a deal with the United Transportation Union, the railway reopened in 1988 between Skagway and the White Pass summit purely for tourist passenger traffic. It gradually extended service further into Canada as jurisdictional and customs issues were resolved. A work train reached Whitehorse on September 22, 1988, to retrieve parked locomotives, and most tracks in downtown Whitehorse were later torn up. The main line reopened to Fraser, British Columbia, in 1989, and to Bennett in 1992.

The heritage railway was revived in 1988, reopening between Skagway and White Pass for tourist passenger traffic. A work train reached Whitehorse on September 22, 1988, to haul parked locomotives back to Skagway for overhaul. In April 1982, locomotive No. 73 was restored to operating condition and began hauling excursion trains. The railway still uses vintage parlor cars, the oldest four built in 1881, and four new cars built in 2007 follow the same 19th century design.

  • 1988: Reopened for tourist traffic between Skagway and White Pass summit.
  • 1989: Main line service extended to Fraser, British Columbia.
  • 1992: Service extended to Bennett, British Columbia.
  • 1997: A train reached Carcross station for the Ton of Gold centennial. A special run from Carcross to Whitehorse occurred on October 10.
  • 2006/2007: Announced regular passenger service to Carcross, with six trains per week starting in May 2007.
  • 2018: The railway was purchased by Carnival Corporation & plc in July.

The current operational main line runs from Skagway to Carcross. This represents a portion of the original route to Whitehorse. The railway has plans to eventually reopen the entire line to Whitehorse if a market exists. The tracks are currently only certified to Carcross by the Canadian Transportation Agency.

The heritage operation utilizes historic equipment, including parlor cars built as early as 1881, and has added four new cars built to 19th-century designs in 2007. At least eight cars have wheelchair lifts. Steam locomotive No. 73 was restored to operating condition in April 1982 and began hauling excursion trains on May 29 of that year. The railway also acquired rolling stock from Canadian National's abandoned Newfoundland operations in November 1988, including eight dump cars and eight ballast hoppers, which were converted from 3 ft 6 in gauge to the WP&YR's 3 ft gauge and retain their CN orange paint.

Route, Engineering and Scenery

The White Pass and Yukon Route is an isolated system with no direct connection to any other railroad, requiring all equipment, freight and passengers to be ferried by ship to Skagway or via road. The line is a masterpiece of early 20th-century railway engineering, built through some of North America's most rugged terrain. The original route featured dramatic engineering feats like the steel cantilever bridge over Dead Horse Gulch, which was later bypassed by a tunnel and new bridge in 1969 to handle heavier ore trains from the Faro mine. The scenery traversed is a major part of the railway's appeal and a key reason for its revival as a tourist line. The route passes through the coastal rainforest of Alaska, ascends into the bare, rocky alpine environment of the pass, and follows the shores of long, narrow lakes in British Columbia and Yukon, such as Bennett Lake. Passengers on the tourist trains experience vistas of mountains, glaciers, waterfalls, and historic remnants of the gold rush along the tracks, including parts of the original White Pass trail. The railway's designation as an International Historic Civil Engineering Landmark in 1994 by the Canadian Society for Civil Engineering and the American Society of Civil Engineers recognizes the extraordinary difficulty of its construction and its enduring integrity. The construction required blasting a roadbed in solid rock and using a narrow gauge that allowed the route to follow the natural contours of the land more closely.

White Pass Railway over the Bernard Lake, British Columbia, Canada
Photo: Diego Delso / Wikimedia Commons (CC BY-SA 4.0)

Rolling Stock and Operations

The White Pass and Yukon Route's fleet reflects its long and varied history. Its steam era was dominated by 2-8-2 Mikado types, including the famous pair No. 72 and No. 73, built by Baldwin in 1947 and now used for heritage steam excursions. The railway was an early adopter of diesel power among narrow-gauge lines, beginning in the mid-1950s. Its diesel roster included unique 'shovelnose' units from General Electric and road-switchers from American Locomotive Company (ALCO) and its Canadian licensee, Montreal Locomotive Works. As of 2005, one diesel locomotive still wore the blue scheme, while the steam engines remained black.

Passenger equipment ranges from historic wooden-bodied coaches and parlor cars to modern replicas. The railway operates a mix of standard excursion trains and specialized services. The Whitehorse Waterfront Trolley, a tourist line run by a local historical society, operates on a single new track along the Whitehorse waterfront, six blocks south of the old train depot. Freight operations are now minimal. The railway's operations are tightly integrated with the cruise ship schedule in Skagway, with trains often departing from a terminal adjacent to the docks. The railway bid on ore-haul from the reopened Faro mine in the late 1980s but its price was considerably higher than road haulage over the Klondike Highway.

Key pieces of rolling stock and their histories include the steam locomotives 72 and 73, the last purchased in 1947 and retired in 1964 before No. 73's 1982 restoration. The Duchess locomotive used on the Taku Tram is now on static display in Carcross. The Clifford J. Rogers was the railway's early container ship, built in 1955. Four vintage parlor cars were built in 1881, predating the railway itself by 17 years. The railway also owns eight side-pivot, drop-side air dump cars and eight longitudinal hoppers acquired from Canadian National's Newfoundland operations in 1988 and regauged. The SS Tutshi, which connected to the Taku Tram, was destroyed by a suspicious fire around 1990, while the MV Tarahne was restored and hosts special dinners. Lifeboats built for Tutshi's restoration were donated to Tarahne.

After its revival, the railway reacquired some of its former equipment. Five diesel locomotives sold to Colombia were re-acquired in 1999. One of these was nearly lost at sea during a storm as it broke loose on a barge. The heritage railway also uses vintage parlor cars, some of which predate the WP&YR itself.

  • CN Newfoundland Cars (1988): Acquired eight side-pivot, drop-side air dump cars and eight longitudinal ballast hoppers, converted from 3 ft 6 in gauge.
  • New Parlor Cars (2007): Added four new passenger cars built to 19th-century design specifications.
  • Colombian Diesels (1999): Re-acquired five ALCO diesels originally sold to Colombia in 1982, one of which nearly rolled off a barge during a storm.
  • Wheelchair Lifts: At least eight passenger cars on the heritage railway are equipped with wheelchair lifts for accessibility.

Questions about White Pass and Yukon Route

Where does the White Pass and Yukon Route run?

The White Pass and Yukon Route runs from the port of Skagway, Alaska, northward into Canada. Its tracks cross into British Columbia, climb over the White Pass summit, and continue into the Yukon. The heritage railway currently operates trains from Skagway to Carcross, Yukon, a distance of 67.5 miles. The original line extended all the way to Whitehorse, Yukon, 107 miles from Skagway, but the northernmost section is not currently in regular service for passenger trains. The line is isolated, with no connection to other railroads, so all equipment arrives by sea or road.

Why was the White Pass and Yukon Route built?

The railway was built as a direct result of the Klondike Gold Rush that began in 1897. Prospectors needed a reliable way to transport themselves and their mandatory ton of supplies from the coastal ports of Alaska, like Skagway, over the treacherous mountain passes and into the Yukon gold fields around Dawson City. The existing trails, like the Chilkoot and White Passes, were extremely difficult and required multiple trips. Construction began in May 1898 to provide a faster, safer alternative to pack horses and human portage, and the line was completed in July 1900, becoming the primary transportation route to the interior and supplanting the trails.

Can you take a train from Skagway to Whitehorse today?

No, you cannot take a direct passenger train from Skagway to Whitehorse on the White Pass and Yukon Route. The heritage railway currently operates from Skagway to Carcross, Yukon. The tracks beyond Carcross to Whitehorse exist but are not certified for regular passenger service by the Canadian Transportation Agency. The railway has operated special excursion trains to Whitehorse in the past, such as in 1997, and has expressed interest in eventually reopening the full line if market demand exists. For now, the railway offers service to Carcross with connecting motorcoach travel.

When did the White Pass and Yukon Route stop running as a commercial railroad?

The White Pass and Yukon Route ceased its commercial freight and passenger operations on October 7, 1982. The closure was triggered by a collapse in metal prices that year, which caused the closure of the Faro lead-zinc mine and other mines that were the railway's primary customers. Without this ore traffic, the railway was no longer financially viable and had been running at a loss for months. It was revived six years later, in 1988, as a seasonal heritage railway focused on serving the growing tourist market from cruise ships visiting Skagway, following a deal with the labour union.

Who owns the White Pass and Yukon Route now?

As of July 2018, the White Pass and Yukon Route is owned by Carnival Corporation & plc, the world's largest cruise company. The purchase aligned the historic railway with the cruise industry that has become its main source of passengers. Prior to this, the railway had been owned by a joint venture controlled by Survey Point Holdings, with a minority holding by Carnival. The railway operates as a heritage tourist attraction, running scenic excursions from Skagway during the Alaska cruise season. It was previously a subsidiary of Tri White Corporation, the parent of Clublink, before that sale.

What is the significance of the White Pass and Yukon Route in World War II?

The White Pass and Yukon Route was a critical strategic asset for the United States and Canada during World War II. Following the attack on Pearl Harbor and Japanese occupation of some Aleutian Islands, the US government leased the railway effective October 1, 1942, to supply the construction of the Alaska Highway, using Whitehorse as a principal staging point. The United States Army took control, with the 770th Railway Operating Battalion operating trains alongside civilian staff. The Military Railway Service brought in 26 additional locomotives and 258 freight cars to supplement the line's original equipment. Traffic increased enormously, with the railway carrying 281,962 short tons in 1943, equivalent to ten years of typical prewar traffic. On a single day, August 4, 1943, the line moved 38 trains, demonstrating its vital role in the war effort in the North Pacific.